382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Fuselage - Finish 4 Point Harness

December 18, 2020 2.5 hours Fuselage Building Jeremy, Samantha

Finished the 4-point harness mounts. In order to get the center attachment bolt perfectly aligned, we drilled a final size hole in a piece of 2x4 that was sized to fit inside of the top doubler. This allowed us to drill straight through the doubler, through the top skin and then a lot of dead space and finally into the seat belt channel.