382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Fuselage - Control Stick

December 30, 2020 6.5 hours Fuselage Building Jeremy, Samantha, Al

Riveted front control bearing, installed flaperon bellcranks, and control stick.

It took much more time than anticipated to drill through the bellcrank bushings. Part of that was dropping an AN-7 washing that disappeared into thin air!