382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Fuselage - Miscellaneous

July 6, 2021 6.0 hours Fuselage Building Jeremy, Samantha

  • Double checked tightness of all positive and negative bus terminals
  • Double checked tightness of all firewall forward positive and negative wire runs
  • Torqued center rudder pedal support blocks
  • Removed air bubble from right brake line
  • Performed magnetometer interference testing with engine run
  • Performed ADAHRS vibration testing with engine run
  • Determined proper wiring for Map Light
  • Determined proper wiring for Instrument Panel Lighting
  • Talked to DAR, giving a 2-3 week heads up
  • Wired AP DISC line from stick grips to AP servo area