382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 7

July 13, 2021 9.0 hours Fuselage Building Jeremy, Samantha

  • Picked up scales
  • Rivet wing tips
  • Secure connectors for wing tip strobes/nav lights
  • Hose clamps for scat tubing
  • Fuel Drained preparing for empty weight/weight and balance
  • Right side center console rudder fairing installed
  • Deliver data plate to be engraved
  • Install screws in baffling
  • Formed and installed pilot side rudder exit fairing
  • Formed and began installation of passenger side rudder exit fairing
  • Compressed Nose Strut (may need more pressure)