|
382 |
days |
|
904.2 |
hours |
|
13 |
partipants |
a Zenith CH 750 CruZer
- Picked up scales
- Rivet wing tips
- Secure connectors for wing tip strobes/nav lights
- Hose clamps for scat tubing
- Fuel Drained preparing for empty weight/weight and balance
- Right side center console rudder fairing installed
- Deliver data plate to be engraved
- Install screws in baffling
- Formed and installed pilot side rudder exit fairing
- Formed and began installation of passenger side rudder exit fairing
- Compressed Nose Strut (may need more pressure)