382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 13

July 19, 2021 8.0 hours Fuselage Building Jeremy, Samantha

  • Installed ELT antenna
  • Built ELT antenna cable
  • Installed elevator plastic cable guide
  • Set elevator control throw
  • Protected rear wires from center console from its sharp edges
  • Final install of center console side panels