382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 14

July 20, 2021 7.0 hours Fuselage Building Jeremy, Samantha

  • Installed longer bolts for hubs
  • Set lash on wheel bearings
  • Install cotter keys in main wheel axels
  • Redesigned the elevator stop for down travel
  • Installed longer bolts for rear horizontal stabilizer mount