382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 14

July 21, 2021 8.2 hours Fuselage Building Jeremy, Samantha

  • Mounted GPS puck to glare shield
  • Installed ELT antenna cable
  • Drained fuel from return lines
  • Installed “bushing” on lower elevator cable for the bungee cord to attach to
  • Routed fuel return line from engine better, keeping it clear of the starter terminals since it is braided and grounded
  • Rounded corners in cockpit
  • Tensioned elevator cables
  • Cotter pin in rear elevator cable
  • Label 2A breaker “Fuel Switch”
  • Label 15A breaker “Start Trig”
  • Installed N number on both sides of the vertical stabilizer