382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 15

July 22, 2021 10.0 hours Fuselage Building Jeremy, Samantha

  • Printed/placed all labels for all instruments, knobs, and switches
  • Elevator bungee cord installed
  • Final tension set on elevator cables and turnbuckles safety clipped
  • Added cotter pins to both upper and lower elevator pulleys
  • Installed L-angles on horizontal stabilizer for vertical stabilizer
  • Reinforced UP elevator stop where it comes in contact with horizontal stabilizer