Wrap-up Day 15
- Printed/placed all labels for all instruments, knobs, and switches
- Elevator bungee cord installed
- Final tension set on elevator cables and turnbuckles safety clipped
- Added cotter pins to both upper and lower elevator pulleys
- Installed L-angles on horizontal stabilizer for vertical stabilizer
- Reinforced UP elevator stop where it comes in contact with horizontal stabilizer