382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 16

July 23, 2021 9.0 hours Fuselage Building Jeremy, Samantha

  • Installed rudder stops
  • Installed vertical stabilizer to horizontal stabilizer L-angles
  • Installed vertical stabilizer
  • Installed rudder, including safety wire for rudder hing pin
  • Routed fuel return line safely around starter
  • Installed elevator safety wire for elevator hing pin
  • Installed pilot side elevator tip