382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 18

August 10, 2021 3.0 hours Fuselage Building Jeremy, Samantha

  • Cleaned silicon off top of fuselage behind skylight window
  • Applied torque viz on wing spar nuts
  • Shortened spacers on oil-air separator so that bolts had required 2 threads showing
  • Installed cotter pins in rudder cables at rudder
  • Installed “door trim” material around seat trays and center console edges. This door trim material takes a straight edge and makes it safe if you rub against it.