382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 20

August 12, 2021 6.0 hours Fuselage Building Jeremy, Samantha

  • Removed silicon from inside of skylight window
  • Replaced one single long screw/nut in skylight window
  • Set flaperon neutral point
  • Flip Flap/Trim Enable Switch
  • Cleaned spray paint mess on concrete :-/
  • Shorten spacers for oil/air separator and remount
  • Shorten elevator center channel push tube