382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 22

August 14, 2021 5.0 hours Fuselage Building Jeremy, Samantha

  • Bent aluminum sheet for fuel line channels
  • Flaperon control stops installed
  • Install rudder pedal cotter pins
  • Install grip tape on floor
  • Secure control stick wire bundle
  • Labeled Pilot and Co-Pilot Headset Jacks
  • Install elevator cable cotter pins
  • Install elevator bell crank cotter pin
  • Replace bolt for right flaperon bell crank (too short)
  • Torqued all nuts in flaperon control linkage assembly