382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 33

August 27, 2021 4.0 hours Fuselage Building Jeremy, Samantha

  • Wire Capacitor
  • Finish Helmet
  • Worked on nose gear alignment, need to adjust rudder cables
  • Install Fire Extinguisher
  • G3X
    • Verified Transponder Mode-S Address
    • Verified all LRUs are reporting and have 0% packet loss
    • ECS - Verified Motor Disconnect
    • ECS - Verified Pitch Trim buttons are wired properly
    • Verified System Information
    • Verified System Options
    • Verified LRU
    • Verified ESP is turned OFF – Enable once AP is fine tuned
    • Flaps
      • Set Max Airspeed 65 kts
      • Set Partial Flaps Max Airspeed 65 kts
    • Set Airspeeds (VNE, VNO, VS0, VS1, VFE, VA, VX (guess), VY (guess), VR (guess))
    • Set Units
    • Checked Audio
    • Checked DME
    • Checked COM Radio
    • Checked NAV Radio
    • Checked Transponder
    • Checked External Lights
    • Checked Cockpit lighting
    • Checked Diagnostics – No Errors
    • Configured gauge markings
  • GNX 375
    • Align AHRS
    • Remove XPDR control from PFD