382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Tail Build Session 3

September 23, 2020 4.0 hours Tail Building Jeremy, Samantha, Anne, Claire

After leveling the table, we were able to clamp the horizontal stabilizer’s skeleton to the table on the rear spar. We then used some door shims on the front spar to fine tune the leveling so that the front and rear spar were within 0.2 degrees of each other.

We then deburred and applied Cortec primer to the skin where it would be riveted to the skeleton and riveted the bottom skin.

We also cleco’d one end stabilizer end rib, cut, drilled and cleco’d one of it’s L brackets. Dinner then called and our build session was done for the evening.