382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Tail Build Session 9

October 4, 2020 1.5 hours Tail Building Jeremy, Samantha

Worked on and around the L-arm, finishing all internal parts, riveted the horn doubler angle and rear elevator center channel internally, built top/bottom L-brackets mounted beside the balance arm, ensured everything was deburred and ready for riveting.

The only thing remaining on the elevator now is the trim tab installation.