382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Avionics - Radio Rack and LRU Mount

January 19, 2021 6.0 hours Avionics Building Jeremy

Finished radio rack with full support. Also created mounting brackets for the GAD 27 (Flap/Trim/Light/Airframe Controller) and GEA 24 (EIS). Further, the GMA 245R will mount below the radio rack, but I still need to drill holes for it.

I decided on this open design instead of the traditional L-angle w/sheet metal in order to keep things open. I can reach things from below the panel easily or if I have to do major work, I can remove four screws and move the PFD out of the way, which allows for a large access hole that I can fit two arms in to work.

All connectors are facing forward for to make it easy to access from below or from the PFD hole.