382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 4

July 10, 2021 12.0 hours Fuselage Building Jeremy, Samantha, Lucas

  • Starting fit of front window, broke front window
  • Aligned and tightened all switches
  • Rivet center console to seat pans
  • Install snap heads for seat cushions
  • Install window in passenger door
  • Measured location for passenger door shock
  • Install inner sloping wing root skins
  • Install Passenger Warning Sticker on Panel
  • Bolt down engine baffles