382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 5

July 11, 2021 9.5 hours Fuselage Building Jeremy, Samantha, Lucas

  • Picked up window from Curt who graciously allowed me to steal his window since I broke mine
  • Install gas strut for passenger door
  • Secured oil/air separator hoses
  • Secured fuel pump relay wires via adel clamp
  • Trimmed to fit front window
  • Trimmed to fit top window
  • Drilled rivet holes for top window
  • Installed rear-most side windows
  • Secured CHT/EGT probe leads to engine
  • Miscellaneous cleanup on FWF wiring
  • Re-installed control stick
  • Tested single flashing landing light vs. alternating, decided on single flash