|
382 |
days |
|
904.2 |
hours |
|
13 |
partipants |
a Zenith CH 750 CruZer
- Picked up window from Curt who graciously allowed me to steal his window since I broke mine
- Install gas strut for passenger door
- Secured oil/air separator hoses
- Secured fuel pump relay wires via adel clamp
- Trimmed to fit front window
- Trimmed to fit top window
- Drilled rivet holes for top window
- Installed rear-most side windows
- Secured CHT/EGT probe leads to engine
- Miscellaneous cleanup on FWF wiring
- Re-installed control stick
- Tested single flashing landing light vs. alternating, decided on single flash