382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 6

July 12, 2021 13.5 hours Fuselage Building Jeremy, Samantha, Lucas

  • Finish Front Window
  • Finish Top Window
  • Voltage Regulator Scat Hose Installed
  • Heat Scot Hose cut and in place – need worm gear clamps
  • Rudder Fairings/Bushing
  • Mounted headset jacks
  • Mounted USB charger port
  • Pilot side rudder fairing – began
  • Contacted Geoff about engraving the data plate
  • Trimmed more windshield
  • Drilled all holes in windshield for mounting
  • Installed all interior except baggage floor pan
  • Painted door steel hardware