382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 12

July 18, 2021 9.0 hours Fuselage Building Jeremy, Samantha, Lucas

  • Flip around elevator cables, see if that fixes binding issue
  • Drilled/Fit passenger side rudder cable fairing
  • Rubber door trim
  • Put in place boot cowl panel rubber protector
  • Install brake line protector thing-a-bobs
  • Install vertical stabilizer fairing
  • Rivet passenger side elevator tip