382 |
days |
|
904.2 |
hours |
|
13 |
partipants |
a Zenith CH 750 CruZer
- Wired dome lights
- Secured wing and light wires in co-pilot flaperon control channel
- Riveted flaperon control channels
- Remove metal type/spec painted stamps from interior
- Install Experimental Stickers
- Applied fire barrier around firewall seam and pass-thru holes
- Riveted forward rear windows
- Mounted oil overflow hose
- Further secured sparkplug wires
- Installed nut plates in rear fuselage side inspection holes
- Installed seat belts (4 point harness)
- Installed nut plates into left center control channel tops