the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 32

August 24, 2021 8.0 hours Fuselage Building Jeremy, Samantha, Lucas

  • Install vents in doors
  • Secure pitch trim cable in tail cone
  • Re-install doors (lubricate piano hinge first)
  • Install all access panels (ensure fit and ready for W&B)
  • Ensure no over-center position is remotely possible on Pitch and Roll Servos
  • Ensure no binding on Pitch and Roll Servos
  • Torque Viz Pitch and Roll Servo pushrod bolts
  • Remove rear window protective sheets
  • Wire the charging port to ground and the positive terminal of the solenoid
  • Shortened the elevator push tube making the stick sit a little more forward
  • Install cotter pins in servo control arms
  • Install snaps for control stick boot
  • Install Oil Door