382 days
904.2 hours
13 partipants

the building of N622JC

a Zenith CH 750 CruZer

Wrap-up Day 35

August 29, 2021 8.0 hours Fuselage Building Jeremy, Samantha, Lucas

  • Install cotter pins in nose wheel push tube bolts (rudder pedal side)
  • Install landing/taxi light lens cover
  • Mount rear torque tube support
  • Replace top engine mount bolts from AN6-7A to AN6-10A – We may need an additional washers
  • Adjust nose wheel for straight when rudder is straight
  • Perform weight and balance
  • Perform pump based fuel flow tests
  • Safety wire left gascolator